Downstairs Half Bath - Before and After Demo
Besides painting, my first priority is getting the downstairs half bath redone. Both the toilet and the sink leaked when the inspector went through and the pedestal sink was cracked. Here is what it looked like before the demo: I started the demo on my own, and managed to remove the tall cabinet, the door, the medicine cabinet, electrical covers, toilet paper holder, and some of the trim and wall tile/linoleum. I had a hammer, a screw driver, my power tool, and determination to work with. My boyfriend and brother did the next part of the demo on Saturday. They were able to remove the rest of the wall tile, the floor linoleum, the towel bars, and half of the two levels of plywood before they hit the original diagonal 3/4" subfloor. They also removed the sink and toilet and removed a portion of the subfloor around the toilet, because it was rotten. They had crow bars, saws, and much bigger hammers. I was a little jealous. I did get to pull a few nails and screws up, plus clean up so